After the preliminary examination and the investigation of effectiveness
in 1971 and the announcement of execution plan at the end of
1982, the construction work of Geumgang Estuary Bank started
for the purpose of developing all-weather farmland by keeping
the coast around the downstream of Geumgang River from drought
and flood and of providing the area with agricultural and industrial
water by keeping seawater from flowing in it and by discharging
the water of Daecheong Dam and the water flowed in. It is for
expanding the transportation linked to Chungcheongnam-do by
establishing a road and a railway on it, multipurpose water
resources development project for keeping Gunsan inner and outer
ports from the heaps of earth and sand. The 1st phase of the
project was to establish the 1,841m of estuary, the 1,127m of
tide embankment, the 714m of drain floodgate, and 5.9km of admission
passage and to secure the 142,000,000 ton of pondage. The second
was for 3 tube wells, 9 pumping stations, a 270 km of irrigation
channel, 12,000ha of irrigation works, 13,470km of drainage
works, 10,140ha of readjustment of arable land, and 7,209ha
of rice field from land, which was completed in October, 1989,
six years after the construction had started. It made it possible
to prevent 7,000ha of land from damage from sea wind and to
provide 244,000,000 ton of agricultural water and 121,000,000
ton of living and industrial water every year. The construction
work on 1,841m of Geumgang Estuary Bank linking Seongdeok-ri
Seonsan-myeon Gunsan Jeollabuk-do to Dosam-ri Maseo-myeon Seocheon-gun
Chungcheongnam-do began in 1983 and was completed on October
30, 1990. |
| |
|